Logo
Home|Product|

The RL Tune Architecture

The RL Tune Architecture

The Purde Model and Rl Core
Rl Core in your plant

Prerequisites to Deploy RL Tune

  • Actuated Control Loop

    The process has one or more actuators, like a VFD, valve, pump, blower, or dosing skid, that can be manipulated to influence a measurable outcome. 

  • Measurable Feedback Signal

    One or more sensors that reflect the quality, efficiency, or stability of the processes, like flow, pH, DO, turbidity, temperature, conductivity, etc. 

  • Digital Connectivity

    The control system allows real-time reading and writing access via OPC-UA from an on-premises server without an internet connection. 

Evaluation Setup

Baseline Evaluation
0-2 Weeks
RL evaluates the performance of the plant under baseline control. 
AI Control (short-term)
2-6 Weeks
RL evaluates the short-term performance of the plant under AI control.
AI Control (mid-term)
6-14 Weeks
RL evaluates the mid-term performance of the plant under AI control.
AI Control (long-term)
14-26 Weeks
RL evaluates the mid-term performance of the plant under AI control.